My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-30_PERMIT FILE - X201823602
DRMS
>
Day Forward
>
Permit File
>
Coal
>
X201823602
>
2018-05-30_PERMIT FILE - X201823602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 12:53:49 PM
Creation date
5/31/2018 8:42:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201823602
IBM Index Class Name
Permit File
Doc Date
5/30/2018
Doc Name
NOI Application
From
GCC Energy, LLC
To
DRMS
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gina Jones <br />BLM/TRFO NEPA Lead <br />Bruce Bourcey <br />BLM/TRFO Archaeologist <br />Chad Meister <br />Colorado State BLM Air Quality <br />Nathanial West <br />BLM/TRFO Wildlife <br />Kyle Free <br />Colorado State BLM Minerals <br />CONCLUSION <br />Plan Conformance: <br />❑ This proposal conforms to the applicable land use plan. YES <br />❑ This proposal does not conform to the applicable land use plan <br />Determination of NEPA Adequacy <br />❑ Based on the review documented above, I conclude that this proposal conforms to the <br />applicable land use plan and that the NEPA documentation fully covers the proposed <br />action and constitutes BLM's compliance with the requirements of the NEPA. YES <br />❑ The existing NEPA documentation does not fully cover the proposed action. Additional <br />NEPA documentation is needed if the project is to be further considered. <br />Signature of Project Lead <br />;Signature of Assisfa Field Manager <br />Signa re f the Res`pAsible Official <br />��- <br />Date <br />.5-// 6- `/S <br />Date <br />Date <br />Note: The signed Conclusion on this Worksheet is part of an interim step in the BLM's internal <br />decision process and does not constitute an appealable decision. However, the lease, permit, or <br />other authorization based on this DNA is subject to protest or appeal under 43 CFR Part 4 and the <br />program -specific regulations. <br />GCCMinor Exploration Plan Amendment <br />COC -76563 <br />DOI-BLM-CO4010-2018-0019-DNA <br />Tres Rios Field Office <br />
The URL can be used to link to this page
Your browser does not support the video tag.