My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-30_PERMIT FILE - C1981022A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981022
>
2018-05-30_PERMIT FILE - C1981022A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 9:44:04 AM
Creation date
5/31/2018 7:09:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
5/30/2018
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S�,Yion - _'.0 5. j <br />TABLE 2.05.3 -T1 <br />MINE FACILITIES SUMMARY <br />Facility Description"z Dimensions <br />Bear Creek Fansite <br />Bear Creek Ventilation Fansite <br />16' diameter shaft X 620' deep. Fan structure on 18" <br />15'x 10'x 50' structure <br />Installation <br />concrete slab foundation with fan, drive motor, pre -eng. <br />w/ 18'x 60' x 18" <br />steel structure and associated controls. Electric <br />foundation <br />substation on concrete ties. Up to 3 - 6" x 620' utility <br />boreholes. Chain link fence. <br />Bear Creek Fansite Methane <br />18" x 620' utility borehole, 18'w x 36' 1 x 12'h steel frame <br />18'w x 36'1 x 12'h shed <br />Drainage <br />shed housing two electric methane exhausters on <br />on concrete pad. <br />footings, slab consisting of 28 cy of reinforced concrete. <br />Second Bear Creek Ventilation <br />Second fan structure on existing Bear Creek fansite pad <br />15'x10'x50' steel <br />Fan Installation <br />disturbance. Fan, drive motor, pre- engineered steel <br />structure with various <br />structure, foundation and associated controls. <br />footing, foundation <br />slabs and pedestals, <br />consisting of 153 CY of <br />reinforced concrete. <br />Other Roads <br />Powerline Light -Use Roads <br />Existing and new unimproved roads <br />12' x 37,800' <br />(existing) <br />Ponds and Diversions <br />Mine Water Treatment Pond <br />Existing treatment pond 2003 out of service <br />0.24 acre -feet <br />Sedimentation Pond Al <br />Replacement Sedimentation Pond <br />0.13 acre -feet <br />Sedimentation Pond B <br />Existing sedimentation pond <br />2.0 acre -feet <br />Sedimentation Pond C <br />Existing sedimentation pond <br />0.37 acre -feet <br />Sedimentation Pond D <br />Existing sedimentation pond <br />1.97 acre -feet <br />East Yard Pond <br />Existing sedimentation pond <br />0.28 acre -feet <br />Sub No. 3 Pond <br />Existing sedimentation pond <br />0.16 acre -feet <br />Elk Creek Culvert <br />Steel CMP culvert <br />3,050' x 9' diameter <br />Sedimentation Pond E <br />Sedimentation Pond <br />1.74 acre -feet <br />Sedimentation Pond F <br />Sedimentation Pond <br />0.16 acre -feet <br />Bear Creek Culvert <br />Steel CMP culvert <br />450' x 6' diameter <br />Notes: Assume 12" thick reinforced concrete for slab foundation unless otherwise noted <br />2Assume normal reinforcing and 6" thickness for all foundations except coal handling facilities. <br />For coal handling facilities, assume heavy reinforcing and 12" foundation thickness <br />NIR -97 2.05 -11b Rev December 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.