My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-30_PERMIT FILE - M2018028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018028
>
2018-05-30_PERMIT FILE - M2018028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2021 7:01:12 AM
Creation date
5/30/2018 12:02:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018028
IBM Index Class Name
Permit File
Doc Date
5/30/2018
Doc Name
Application
From
Tom Zimmerman
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reclamation, when removed by the small equipment(when hand digging is occurring, all <br /> material is worked through the sluice together and stockpiling does not occur). <br /> Present vegetation is dominated by Russian thistle and cacti, as shown in Figure 3. Little to no <br /> riparian vegetation is present in the proposed work area, as shown in Figure 4. The small tractor <br /> equipment may be used during reclamation to fill holes and apply topsoil. Hand tools will <br /> continue to be used for filling and shaping reclamation as well. <br /> Proposed occupancy <br /> The operator would also like to stage a temporary, weather resistant, steel locker(tool chest) that <br /> will not be larger than 4' x 4' x 8' to store equipment securely on site. It is proposed that the <br /> locker would be located on the western edge of the proposed work area at the base of the hill in a <br /> place behind big boulders, in order to reduce its visibility. It is proposed that gasoline and other <br /> petroleum products used in motorized operations may be stored in this unit as well as equipment <br /> that will be used daily. The locker will be located a minimum of 100-feet from the edge of the <br /> river and will stay onsite for the remaining life of the mine and will be removed during final <br /> reclamation. It will be secured with a heavy duty lock. <br /> In addition, the small tractor may be left on site overnight while in use,but will be removed from <br /> the site during times of non-use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.