My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-29_REVISION - X201723402
DRMS
>
Day Forward
>
Revision
>
Coal
>
X201723402
>
2018-05-29_REVISION - X201723402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 10:26:15 AM
Creation date
5/30/2018 9:05:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201723402
IBM Index Class Name
Revision
Doc Date
5/29/2018
Doc Name
Notice of Acceptance
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
AM1
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Replace Topsoil on Drill Pads, Mud Pits and Access Roads <br />Site: West Panel State Expansion Permit Action: 2018 AM1 Permit/Job#: X201723402 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 5/24/2018 County: Moffat <br />User: TNL <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: 004 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series II <br />LGP <br />Horsepower: 240 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/flour: <br />$60.88 <br />NA <br />Operating Cost/Hour: <br />$61.14 <br />100 <br />Ripper own. <br />$0.00 <br />NA <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/flour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $163.87 <br />Total Fleet Cost/Hour: $163.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,872 <br />Swell factor: 1.000 <br />Loose volume: 4,872 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />50 feet <br />800.0 LCY/hr <br />Partly consolidated stockpile 1.1 <br />0% <br />6,200 feet <br />1,600 lbs/LCY <br />Top Soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.