My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-29_REVISION - X201723402
DRMS
>
Day Forward
>
Revision
>
Coal
>
X201723402
>
2018-05-29_REVISION - X201723402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 10:26:15 AM
Creation date
5/30/2018 9:05:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201723402
IBM Index Class Name
Revision
Doc Date
5/29/2018
Doc Name
Notice of Acceptance
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
AM1
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: <br />Site: West Panel State Expansion Permit Action: 2018 AM1 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 5/24/2018 County: Moffat <br />User: TNL <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: X201723402 <br />Abbreviation: None <br />Filename: X234-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Plug and Abandon Four Exploration Boreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />5.00 <br />$1,933.76 <br />$3,047.00 <br />$617.00 <br />$1,056.00 <br />$1,342.00 <br />Backfill and Regrade Drill Pads and Mud Pits <br />DOZER <br />18.60 <br />Backfill and Regrade Access Roads <br />DOZER <br />3.77 <br />Replace Topsoil on Drill Pads, Mud Pits and <br />Access Roads <br />DOZER <br />6.44 <br />Reseed Drill Pads and Access Roads <br />REVEGE <br />3.02 <br />SUBTOTALS: <br />36.83 <br />$7,996 <br />INDIRECT COSTS <br />$161.52 <br />OVERHEAD AND PROFIT: <br />$0.00 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />0.00 <br />Job superintendent: <br />18.42 <br />Profit: <br />10.00 <br />Total = <br />$161.52 <br />Total = <br />$0.00 <br />Total= <br />$1,345.22 <br />Total = <br />$799.60 <br />TOTAL O & P = <br />$2,306.34 <br />CONTRACT AMOUNT (direct + O & P) = <br />$10,302.34 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />10.00 <br />Total = $1,030.23 <br />Reclamation management and/or administration: <br />7.10 <br />$731.47 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $4,068.04 <br />TOTAL BOND AMOUNT (direct + indirect) = $12,064.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.