My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-24_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-05-24_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 7:12:27 AM
Creation date
5/30/2018 7:01:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/24/2018
Doc Name
Application
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
SL14
Email Name
ZTT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk Ridge Mining and Reclamation, LLC. <br />Colowyo Mine <br />Permit No. C-1981-019 <br />2018 PHASE II REVEGETATION EVALUATION REPORT <br />PHASE II BOND RELEASE BLOCK: <br />REFERENCE AREAS: <br />WP015 WPO19 MOUNTAIN SHRUB <br />WPO17 WP020 SAGEBRUSH <br />WPO18 <br />1.0 INTRODUCTION <br />Cedar Creek Associates, Inc. (Cedar Creek) was contracted in 2017 by the Colowyo Mine (Colowyo) <br />to evaluate revegetated units for Phase II bond release. Units included in this Phase II evaluation were <br />established and reclaimed between 2011 and 2014. Data collection was performed in the interest of <br />ascertaining progress toward revegetation success in accordance with Permit Section 4.15. The Phase II <br />Bond Release Block consists of 265.5 acres from 5 revegetated units that were evaluated in 2017. In <br />addition, two reference areas (Mountain Shrub — 1980 and Sagebrush — 1981) were sampled to provide <br />ground cover comparison values to facilitate an evaluation of success for the reclaimed units. The <br />sample points for the Phase II Bond Release Block and reference areas evaluated in 2017 are provided <br />on Maps 2 through 4. <br />Field sampling for ground cover was systematically conducted <br />from July 31s' through August 4th, 2017. Sampling occurred amidst the <br />peak of growth in late July and early August. Field efforts in 2017 <br />were conducted by or under the direct supervision of Cedar Creek's <br />Senior Reclamation Ecologist and Soil Specialist, Mr. Jesse H. Dillon. <br />Acreages presented in this document have been determined by <br />Colowyo Mine. Raw data tables are presented in Appendix A. <br />1 <br />Unit <br />Rrst <br />Growing <br />Season <br />Acres <br />WP015 <br />2011 <br />103.8 <br />WPO17 <br />2014 <br />12.6 <br />WP018 <br />2014 <br />31.2 <br />WP019 <br />2014 <br />22.1 <br />W PO20 <br />2014 <br />95.8 <br />Total <br />265.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.