My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-25_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2018-05-25_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2021 5:41:16 AM
Creation date
5/25/2018 12:45:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
5/25/2018
Doc Name
Request for Technical Revision
From
Natural Soda, LLC
To
DRMS
Type & Sequence
TR40
Email Name
THM
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-1983-194 - TR40 Recelveo <br /> Complied! <br /> NO prior Violations! MAY 25 2018 <br /> * k CO7 thm, whe Jr■/} j�p�/Q� �` <br /> 1/vau aai V aka� a..JiVl\ va 1WL VL111�iL111V1\'1�111\11\V �D' � <br /> vs 1313 Sherman Street,Room 215,Denver,Colorado 80203 h(303)866-3567 MININ A-N1\D, �1OOV p G SAFE Ty <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> FileNo.:M- 1983-194 Site Name:Natural Soda Nahcolite Project <br /> county Rio Blanco TRH QRMS use o W <br /> Permittee: Natural Soda LLC <br /> Operator(If Other than Permittee): <br /> PermitteeRepresentative: Gerald Daub, Daub & Associates, Inc. <br /> Please provide a brief description of the proposed revision: <br /> See attached <br /> As defined by the Minerals Rules,a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered`filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1,2 or 3) $1006 ❑✓ <br /> Daub&Associates, Inc. Page 2 of 8 17H-SSMW DRMS TR <br />
The URL can be used to link to this page
Your browser does not support the video tag.