Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS (cont) <br /> RECLAMATION COSTS <br /> 1 . Revegetation, 15 . 00 ac @ $650 . 00/ac $ 9, 750 . 00 <br /> 2 . Resoiling, 12 , 100 yd3 x v 1 . 12x $0 . 548/yd3 7, 433 . 83 <br /> 3 . Sloping using cut/fill method <br /> 12 , 820 yd3 x $0 . 637 yd3 8 , 171 . 85 <br /> 4 . Seed bed grading and backfill slope shaping <br /> 15 . 00 ac x $59 . 54/ ac . 893 . 04 <br /> 5 . Secondary Seeding 15 . 00 ac @30% x $650 . 00/ac 2 , 925 . 00 <br /> 6 . Weed control 5, 000 . 00 <br /> Net Total $ 34, 162 .72 <br /> 6 . Indirect costs <br /> Mobilization 3 , 956 . 50 <br /> Insurance, Bond, & Profit 4 , 618 . 80 <br /> 7 . Administration costs 3 , 878 . 32 <br /> TOTAL ESTIMATE $46, 595 .32 <br /> (Approx $3 , 06 . 35/ac . ) <br /> Grand County Department of Road and Bridge is a local government agency and as <br /> such is not required to post a bond. <br /> 47 <br />