My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-24_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2018-05-24_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2018 9:16:41 AM
Creation date
5/25/2018 8:20:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
5/24/2018
Doc Name
Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL11
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOTAL 139.47 39.21 <br />DIRECT COSTS $35,268 <br />Phase III <br />Request <br />May -18 <br />$3,526 <br />$744 <br />$5,660 <br />$26 <br />$17 <br />$168 <br />$343 <br />$10,484 <br />SL -11 05/18 <br />SNOWCAP COAL COMPANY <br />PHASE III BOND RELEASE (SL -11) <br />ROADSIDE SOUTH PORTAL <br />TASKS FOR RELEASE <br />(based on Bond Cost Estimate for RN -7 dated 9/28/17) <br />Current <br />Requested <br />Current Cost <br />DRMS <br />DRMS <br />Release <br />Estimate <br />Task # <br />Task Hrs <br />Task Hrs <br />DESCRIPTION <br />Sep -16 <br />121 <br />0.00 <br />0.00 <br />Plug and Seal Boreholes <br />$3,526 <br />131 <br />3.40 <br />3.40 <br />Drill Seed Upland Seed Mix on Mine Site <br />$744 <br />132 <br />9.80 <br />9.80 <br />Broadcast Seed Upland Mix/Steep Areas <br />$5,660 <br />200 <br />0.11 <br />0.11 <br />Spread topsoil on .3 acre conveyor corridor <br />$26 <br />201 <br />0.07 <br />0.07 <br />Spread topsoil on .2 acre Substation A <br />$17 <br />203 <br />0.73 <br />0.73 <br />Topsoil Light Use Road 1 <br />$168 <br />204 <br />25.10 <br />25.10 <br />D3 Maint over Liability Period <br />$343 <br />205 <br />3.85 <br />Mob Equip for Remaining Reclamation <br />$7,555 <br />206 <br />3.50 <br />Mob Equip for Site Maintenance <br />$825 <br />207 <br />2.83 <br />Topsoil Salvage for TR69 <br />$217 <br />208 <br />0.24 <br />TR69 Topsoil Salvage <br />$36 <br />209 <br />48.00 <br />Excavate and backfill TR69 air shaft repair <br />$9,235 <br />213 <br />6.46 <br />TR69 Compacting fill in excavated hole <br />$1,353 <br />214 <br />1.74 <br />TR69 Replace Topsoil <br />$134 <br />215 <br />0.24 <br />TR69 Topsoil Replacement <br />$34 <br />216 <br />8.00 <br />TR69 Install concrete seal in excavated hole <br />$2,668 <br />217 <br />3.40 <br />Seed TR69 0.4 acre disturbance <br />$582 <br />218 <br />22.00 <br />Water Truck for TR69 activity <br />$2,145 <br />TOTAL 139.47 39.21 <br />DIRECT COSTS $35,268 <br />Phase III <br />Request <br />May -18 <br />$3,526 <br />$744 <br />$5,660 <br />$26 <br />$17 <br />$168 <br />$343 <br />$10,484 <br />SL -11 05/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.