Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds,etc. <br /> 4 proposed drill sites located on existing roads. No new access roads will be constructed. <br /> Approximately three drill holes are planned per site. Maximum number of drill holes will <br /> be 12. Drill holes are expected to be between 500'- 1,000'in length. Drilling will be <br /> program in 2016. (See attached maps showing intended, existing, access roads and drill <br /> i <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter,depth,location,etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> 4 Average 50 Average 50 <br /> Quantity Width (ft) Length (ft) <br /> B. Drill Holes: <br /> 12 1,000 Diameter 2.5 <br /> Quantity Depth (ft) (in) <br /> C. Mud Pits <br /> 12 Average 8.00 Average 8.00 Average 5.00 <br /> Quantity Width(ft) Length (ft) Depth(ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> No underground work proposed. The upper roads- above Golden Wonder 3-Level -will <br /> be brushed and water barred where needed_ <br /> Form I-DRMS Use and Confidential File Page 6 of 14 <br />