Laserfiche WebLink
EXHIBIT 27, ITEM 3 <br />I. INTRODUCTION <br />The Collom In -Pit Drilling Program will consist of drilling 27 drill holes (Please see Figure Exh. <br />27-3-1 for drill pad locations) in order obtain data to enhance the Collom Geologic Model. <br />Planned drill holes will be drilled to approximately 20 feet below the GC seam, which is the <br />lower most seam in the Collom mining sequence. <br />A small area exemption for sediment control for eight drill pads west of the Section 25 Pond <br />watershed is presented in Exhibit 7, Item 25A in Volume 18C. <br />II. SEALING AND RECLAMATION OF DRILL HOLES, DRILL PADS, AND <br />DRILL ROADS <br />Drill pads shown on Figure Exh. 27-3-1 and listed on Table Exh. 27-3-1 will have either one <br />single cole hole or a combination of a rotary and core drill hole. All drill holes will be <br />completely or partially mined through, and will be reclaimed in accordance with Section <br />2.05.4(1) in Volume 15. <br />Topsoil will be stripped or windrowed directly adjacent to all drill pads and drill pad roads. All <br />topsoil that is windrowed will be picked up during the larger stripping effort associated with <br />development of the Collom Pit. Drill pads and drill roads will also be mined through, or will be <br />within the larger disturbance footprint associated with the Collom Pit. All drill pad locations and <br />drill roads will be reclaimed at the appropriate time in accordance with Map 29B and Section <br />2.05.4 in Volume 15 when mining is complete. <br />Exhibit 27 Item 3 1 Revision Date: 5/18/18 <br />Revision No.: MR -186 <br />