Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />0.900 <br />Dozing method: <br />1.200 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.115 <br />Altitude: <br />1.000 <br />Material Weight: <br />1.438 <br />Blade type: <br />1.000 <br />Net correction: 0.8624 <br />Adjusted unit <br />1,345.34 LCY/hr <br />production: <br />Adjusted fleet <br />1345.34 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.336/LCY <br />Total job time: 16.62 Hours <br />Total job cost: $7,511 <br />Source <br />(AVG.) <br />(CAT HB)) <br />(S -BY -S) <br />(AVG.) <br />(1 SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />(CAT HB <br />(CAT HB <br />AT) <br />