Laserfiche WebLink
EXHIBIT 13C <br />Collom Facilities Area <br />Tables 13C-7 through 13C-12 present required information to reclaim and/or demolish items <br />associated with the Collom facilities area. Map 22B shows the areas and structures that will be <br />present for the Collom Mine. Table 13C-10 presents the specific facilities that will be <br />constructed under this cumulative bond schedule. <br />Table 13C-7 Re rade Volumes for the Collom Facilities_ Area <br />Cu <br />Fill Yards Cubic <br />Area Cut p <br />( ) (Cubic Yards) <br />Collom Facilities Area 1,484,400 1,467,700 <br />Table 13C-8 List of Culverts for the Collom Facilities <br />Culvert <br />Size (inches) <br />Length (ft) <br />Number <br />56 <br />36 <br />150 <br />57 <br />36 <br />260 <br />58 <br />36- <br />140 <br />59 <br />36 <br />145 <br />60 <br />36 <br />56 <br />61 <br />36 <br />71 <br />62 <br />36 <br />75 <br />63 <br />36 <br />326 <br />64 <br />36 <br />150 <br />65 <br />36 <br />415 <br />66 <br />36 <br />130 <br />67 <br />36 <br />183 <br />D2 Ditch <br />36 <br />160 <br />Culvert <br />Table 13C-9 Topsoil Volumes for the Collom Facilities Area <br />` Avg. Haul Volume <br />From To Avg. Grade (%) <br />Distance (ft) (Cubic Yards) <br />Topsoil Collom Facilities <br />6,500 5.0 327,278 <br />Stockpile 25A � Area <br />Note: Includes the Section 26 Pond, Sidehill Pond and West Side Access Road. <br />Volume 20 Page 8 Revision Date: 3/23/18 <br />Revision No.: TR -118 <br />