Laserfiche WebLink
Water Tank <br />35' dia <br />Bldg. (MN) <br />279;941.00 <br />CF <br />$0.21 <br />$59,067.55 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />ANFO Silo #1 <br />10' dia x 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />ANFO Silo #2 <br />10' dia x 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />ANFO Silo #3 <br />10' dia x 20' <br />Bldg. (MN) <br />6,283.00 <br />CF <br />$0.21 <br />$1,325.71 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Electrical <br />80' x 80' x <br />Bldg. (SN) <br />76,800.00 <br />CF <br />$0.19 <br />$14,208.00 <br />Substation <br />12' <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Communications <br />20'x 20'x <br />Bldg. (SN) <br />4,800.00 <br />CF <br />$0.19 <br />$888.00 <br />Building <br />12' <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Remove Taylor <br />150' <br />Pipe, steel, welded <br />150.00 <br />LF <br />$6.56 <br />$984.00 <br />Creek Elevated <br />connections - 10 in. <br />Pie <br />diameter pipe <br />Remove Elevated <br />1.5'x 2' <br />Footing, concrete, <br />16.00 <br />LF <br />$3.54 <br />$56.64 <br />Pipe Footers <br />average reinforcing <br />-1.5ft. x2ft. <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 60.00 (unadjusted): $263,178.02 location): $251,335.01 <br />