Laserfiche WebLink
EXHIBIT 13C <br /> Table 13C-27 Topsoil Stockpile Revegetation <br /> Topsoil Stockpile <br /> Acres to be Reseeded <br /> Number <br /> 26B 2.2 <br /> 26A 24.2 <br /> Table 13C-28 Collom In-Pit Drill Holes <br /> Drill Hole Number Plugging <br /> Requirements <br /> C-18-01 through C-18-27 Please see Exhibit 27, <br /> Item 3 <br /> Volume 20 Page 18 Revision Date: 5/4/18 <br /> Revision No.: MR-186 <br />