My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-18_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-05-18_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 12:53:28 PM
Creation date
5/23/2018 6:30:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/18/2018
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 13C <br />Pump House Building and Raw Water Pipeline <br />Tables 13C-18 through 13C- 20 provides items necessary to demolish the pump house building <br />and revegetate the raw water line installation. <br />Table 13C-18 Raw Water Pump Building Requirements <br />20'x32'x14' <br />Steel Building <br />14 Steel I Precast <br />Manhole covers I Concrete Vault <br />(4'x2'x4') I (6'x18'x8') <br />Table 13C-19 To soil Requirements for Raw Water Pipeline* <br />Topsoil Volume <br />Item Name <br />(cubic yards <br />Raw Water <br />28,657 <br />Line <br />*Topsoil will be windrowed directly adjacent to disturbance area. This volume includes where <br />the raw water line crosses Taylor Creek. <br />Table 13C-20 Revegetation Requirements for Raw Water Pipeline* <br />Acres to be Acres to be <br />Item Name <br />Disturbed Reseeded <br />Raw Water <br />36.37 36.37 <br />Line <br />*These acres include where the raw water line crosses Taylor Creek. <br />Volume 20 Page 13 Revision Date: 3/23/18 <br />Revision No.: TR -118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.