Laserfiche WebLink
EXHIBIT 13C <br />Table 13C-10 Collom Primary Crusher Demolition* <br />Item Task <br />Primary 417 <br />Crusher <br />*The item contained on this table references the Division's Reclamation Cost Estimate (RCE) <br />and call out specific tasks within the RCE. The RCE can be found in Exhibit 13A. <br />Table 13C-11 Collom Facilities Concrete Demolition* <br />Item Total Quantity <br />(cubic yards) <br />Concrete 1,293 <br />*This volume includes all concrete at the Collom Facilities for all tables in this section. <br />Table 13C-12 Miscellaneous Facilities Demolition <br />Item Task Build <br />Size/Material <br />Blaster Building 50'x80'x19' <br />Steel Building <br />*The items contained on this table reference the Division's Reclamation Cost Estimate (RCE <br />and call out specific task(s) within the RCE. The RCE can be found in Exhibit 13A. <br />Volume 20 Page 10 Revision Date: 4/27/18 <br />Revision No.: MR -185 <br />Raw Water Tank* <br />ANFO Silos* <br />Electrical Substation* <br />Communications <br />Building <br />Power Poles <br />417 <br />i <br />20' x 20' Steel <br />Building _ <br />15 Poles <br />417 <br />417 <br />N/A <br />N/A <br />*The items contained on this table reference the Division's Reclamation Cost Estimate (RCE <br />and call out specific task(s) within the RCE. The RCE can be found in Exhibit 13A. <br />Volume 20 Page 10 Revision Date: 4/27/18 <br />Revision No.: MR -185 <br />