My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-22_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2018-05-22_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:09:32 PM
Creation date
5/22/2018 12:47:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
HYDROLOGY
Doc Date
5/22/2018
Doc Name
Water Monitoring - Groundwater
From
Christopher Peters
To
DRMS
Annual Report Year
2018
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORA.DO <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 C O L O R A D O <br /> Denver,Colorado 80203 D l V 1 S I o N o r <br /> Phone.(303)866 3567 RECLAMATION <br /> FAX-(303)B32-8106 MINING <br /> SAFETY , <br /> November 27,2012 John W.Hickenlooper <br /> C,ovemor <br /> Mike Kra <br /> Executive Director <br /> Joe Lamanna Lo►ette E Pineda <br /> Holcim(US),Inc. Director <br /> 3500 Highway 120 ' <br /> Florence,CO 81226 <br /> Re: Portland Limestone Quarry, Permit No. M-1977-344, Revised Groundwater , <br /> Monitoring Plan <br /> Mr.Lamanna: ' <br /> The Division of Reclamation, Mining and Safety (DRMS) has reviewed your proposed standards <br /> for MW-13(reference Holcim letter to DRMS dated July 7,2010). The data collected from MW-13 ' <br /> is intended to supplement data collected from MW-7. The DRMS approved numeric protection <br /> levels(NPLs)for MW-7 on February 24,2009. <br /> The DRMS determines NPLs based on the five quarters of monitoring data initially collected from a <br /> proposed monitoring well, not from nearby or upgradient wells. The selected NPL is typically the <br /> larger of two values: 110 percent of the maximum concentration of a constituent of interest <br /> observed during the five quarters of monitoring; or the mean observed concentration of the <br /> constituent plus two standard deviations. Based on the five quarters of data provided by Holcim for <br /> MW-13,the DRMS has determined the following NPLs are appropriate; <br /> Parameter NPL for MW-13 Previously Approved NPL for MW-7 <br /> Total Dissolved Solids(TDS) 4,026 mg/Z * 3,918 mgtf <br /> Sulfate(SO,) 2,200 mg/t 2,080 mg/Z <br /> Potassium(K) 13 mg/f *$ 17 mg/Z <br /> Sodium(Na) 274 mg/e 226 mg/Z <br /> Iron(Fe-dissolved) 0 13 mg/Z $ 4.5 mg/Z <br /> Manganese(Mn-dissolved 0.30 mg/Z $ 0.88 mg/Z <br /> *110%of maximum observed value <br /> t Mean observed value plus 2 standard deviations ' <br /> Holcim will continue to monitor MW-12 (background) and MW-7 (west compliance well), and , <br /> provide results for the above parameters on an annual basis. When observed parameters in MW-7 <br /> and/or MW-13 (east compliance well) exceed the NPL by more than 10 percent, Holcim will <br /> increase the monitoring frequency to semi-annually. <br /> Office of office of <br /> Mined Land Reclamation Denver-Grand Junction-Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.