My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-22_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2018-05-22_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:09:32 PM
Creation date
5/22/2018 12:47:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
HYDROLOGY
Doc Date
5/22/2018
Doc Name
Water Monitoring - Groundwater
From
Christopher Peters
To
DRMS
Annual Report Year
2018
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portland Plant Holcim(US)Inc. Phone 719 784 6325 ' <br /> ti 3500 Highway 120 Fax 719 784 3470 <br /> ' Florence,CO 81226 www.holcim.com/us <br /> tHolJuly 7, 2010 , <br /> Mr. Berhan Keffelew , <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 , <br /> Denver, CO 80203 <br /> Re: Proposed Groundwater Monitoring Plan, DRMS Permit M-1977-344 , <br /> Dear Mr. Keffelew, , <br /> The purpose of this groundwater monitoring plan (GMP) is to fulfill the requirements of <br /> Technical Revision#6(TR-06)to the Division of Mining, Reclamation and Safety Permit M- , <br /> 1977-344. This permit is for the Holcim (US) Portland Plant quarry located adjacent to the <br /> cement plant in Florence, Colorado. The quarry is located on the north side of the Arkansas <br /> River. Groundwater in the area flows in a generally southerly direction toward the river. ' <br /> Holcim proposes annual sampling of the following monitoring wells: <br /> • MW-12 - Background well located in the north end of the quarry. <br /> • MW-7- Compliance well located in the southwest area of the quarry (approximately' <br /> mile inside the quarry main entrance). <br /> • MW-13 - Compliance well located in the southeast area of the quarry, approximately 100 <br /> feet north west of the intersection of State Highway 120 and Bear Creek (approximately <br /> % mile east of the main quarry entrance). <br /> In addition, Holcim will continue monitoring water level in wells P-2, P-3, MW-9, and MW-11. ' <br /> Holcim proposes monitoring for the following parameters: <br /> • Total Dissolved Solids (TDS) ' <br /> • Sulfate (SO4) <br /> • Potassium(K) <br /> • Sodium (Na) ' <br /> • Iron (Fe) <br /> • Manganese (Mn) <br /> In addition, the following field parameters will be recorded. ' <br /> • pH <br /> • specific conductance <br /> • temperature ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.