Laserfiche WebLink
Table 1 04 ARCAD IS for Design natural and <br /> March 2018 Depth to Groundwater Measurements and Groundwater Elevations burnt sets d <br /> built assets <br /> 2018 Groundwater Monitoring <br /> Holcim (US) Inc. <br /> Florence. Colorado <br /> Depth <br /> Well TOC •- GW Elevation Total Screened <br /> Well Bottom <br /> Diameter Elevation March 2018 March 2018 <br /> Number March Well <br /> Depth <br /> 18 <br /> (ft btoc) <br /> MW-7 4 5056.26 26.74 50.30 5029.52 47 17-42 <br /> MW-9 4 5121.90 7.96 45.55 5113.94 42 17-37 <br /> MW-11 2 5095.87 54.64 105.65 5041.23 103 58-103 <br /> MW-12 2 5254.04 95.90 150.30 5158.14 148 103-148 <br /> MW-13 2 5040.00 18.35 31.95 5021.65 30 15-30 <br /> P-2 1.5 5079.46 4.67 29.05 5074.79 36 31-36 <br /> P-3 1.5 5063.28 28.17 39.45 5035.11 37 32-37 <br /> DP-1 2 5069.70 7.80 36.50 5061.90 34 24-34 <br /> NP-1 2 5147.40 42.93 73.50 5104.47 70 60-70 <br /> Notes: <br /> ft amsl-Feet above mean sea level. <br /> ft bgs-Feet below ground surface. <br /> ft bloc-Feet below top of casing. <br /> GW-Groundwater. <br /> MW-Monitoring well. <br /> NA-Not available. <br /> P-Piezometer. <br /> TOC-Top of casing. <br /> Groundwater levels measured on March 6,2018 <br /> Tables 12 04132018 Page 1 of 1 <br />