Laserfiche WebLink
-4- <br /> 12. Primau future Post-minin land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one): <br /> laCropland(CR) Pastureland(PL) General Agriculture(GA) <br /> t- i Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> tiResidential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Minine: Briefly explain mining method(e.g.truck/shovel): <br /> excavator and front end loader <br /> 15. On Site Processing: _Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Crushing, screening, asphalt production, stockpiling. Loader into trucks. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Acreage will be increased by 560.0 acres to a total of 640.0 permitted acres. <br />