PR -4
<br />TABLE 14-1
<br />POWDERHRON COAL COMPANY
<br />RECLAMATION SOILS BALANCES
<br />AND AREAS
<br />Disturbed Area
<br />Overburden Selvaged
<br />Pile
<br />Topsoil
<br />Initial
<br />Drainage
<br />Total
<br />Cut-CY Fill -CY Material -CY
<br />Number
<br />Spread- CY Reclamation Area -Acres Area -Acres
<br />Permanent Flood Control Dike
<br />0 (18000) (18000) River Island
<br />0
<br />(2.8)
<br />0
<br />2.8
<br />South Lease Exploratoln
<br />0 0 (11300)
<br />Temp
<br />(11300)
<br />(7.0)
<br />0
<br />7.0
<br />North Decline
<br />(125000) (125000) 0
<br />0
<br />(15.3)
<br />3.1
<br />18.4
<br />Roadside South Portals
<br />'Access Road Construction
<br />17,000 46,000
<br />13.1
<br />1.5
<br />14.6
<br />"Mine Portal Highwall Backfill
<br />6,000
<br />Lower Wash Plant Area
<br />13,815 6,502
<br />RSRDA- Slope*
<br />(35,000) (57,000)
<br />(8.8)
<br />8.8
<br />Top of RSRDA
<br />4,356
<br />1.8
<br />1.8
<br />RSRDA Borrow Area
<br />(21,000)
<br />Temp
<br />(1200)
<br />(5.7)
<br />0
<br />5.7
<br />Overland Conveyor and RR Spur
<br />Overland Conveyor
<br />6,700 6,700 7,000
<br />4
<br />(3,469)
<br />4.3
<br />0
<br />4.3
<br />"'Unit Train Loadout
<br />125,000 125,000
<br />0
<br />69.6
<br />0.6
<br />70.2
<br />Roadside North Portal
<br />(230,800) (230,800) (31,400)
<br />1&3
<br />(22,667)
<br />(26.1)
<br />28.1
<br />Pond 13
<br />2,269
<br />1
<br />403
<br />0.5
<br />0.5
<br />Upper Diversion Ditch
<br />1
<br />1,210
<br />1.5
<br />1.5
<br />CRDA-1
<br />1994 Cover
<br />(6,700) (18,400) (4,600)
<br />5&6
<br />(7,700)
<br />(9.6)
<br />2002 Cover
<br />(33,880) (33,880)
<br />CBA -2
<br />(14.0)
<br />Remaining Cover
<br />0 0
<br />4
<br />3,388
<br />1.4
<br />Coal Canyon and Ponds 6 & 10
<br />2715 23,355
<br />2.8
<br />27.8
<br />Topsoil Pile No. 2
<br />5,242
<br />Coal Gulch and Pond 11
<br />9,609
<br />Topsoil Pile No. 1
<br />3,530
<br />1
<br />2,259
<br />CRDA-2
<br />1994 Cover
<br />(3,400) (24,800) (6800)
<br />7
<br />(5,800)
<br />(7.6)
<br />2002 Cover
<br />0 (35,816) (13877)
<br />2,7,8 & 9
<br />(11,939)
<br />(14.8)
<br />Upper Diversion Ditch
<br />(10000)
<br />Ditch
<br />(6.2)
<br />Stockpile Areas
<br />7, 8 & 9
<br />(2,420)
<br />(3.0)
<br />31.6
<br />South Fan
<br />(1600) (2500) (700)
<br />10&11
<br />(700)
<br />(0.9)
<br />0
<br />0.9
<br />2 West Portals Access Road & Powedines
<br />(3.8)
<br />3.8
<br />2 West Portals
<br />(300) (1300) (1000)
<br />13
<br />(1000)
<br />(0.3)
<br />0.3
<br />2 West Portals Substation
<br />(500) (500)
<br />(0.7)
<br />0.7
<br />Cameo Borrow Area 1
<br />0 0 (33,880)
<br />Temp
<br />(2200)
<br />(2.8)
<br />0.2
<br />3.0
<br />Cameo Borrow Area 2
<br />1994 Selvage
<br />0 0 (15000)
<br />Temp
<br />2002 Salvage
<br />- 0 0 (33,880)
<br />Temp
<br />(1,694)
<br />(2.1)
<br />4.2
<br />Coal Gulch and Pond 11
<br />15916 6,307
<br />1
<br />1,694
<br />2.1
<br />2.1
<br />Topsoil Pile Number 1
<br />13776 14,753
<br />Topsoil Pile Number 2
<br />5242 5242
<br />Roads
<br />0 0 0
<br />0
<br />0
<br />0.0
<br />0
<br />CRDA-3 Deleted From Plan
<br />Existing Reclamation
<br />(403100) (547796) (235,317)
<br />(68,620)
<br />(135.6)
<br />Future Reclamation
<br />186,349 233,981 27,650
<br />5,485
<br />90.2
<br />Totals
<br />689,449 781,777 262,967
<br />74,105
<br />225.8
<br />12.3
<br />238.1
<br />-Difference between access road cut & fill
<br />is 29,000 CY. Deficit will be made up with material from Unit Train Loadout
<br />'• Portal Highwall will be backfilled with excess material from unit train loadout
<br />"'Quantity reduced by 36,000 CY to account for deficit at Road Side South Portal
<br />Page 1 of 3
<br />Rev 02/08