Laserfiche WebLink
• NW Mains Ventilation Shaft and Borehole <br />• 6 -Main North Ventilation/Escape Shaft and associated utility boreholes (7) <br />• EMD Ventilation/Escape Shafts (2, sealed in late 2009) <br />• 18 -Right Ventilation/Escape Shaft (sealed in late 2009) <br />• 15 -Left Utility Borehole (permitted but not completed) <br />• 16 -Left Utility Borehole <br />• 17 -Left Cement Borehole (sealed in 2012) <br />• 18 -Left Ventilation Intake and Return Shafts and utility boreholes (3) <br />• 19 -Right Mine Dewatering Borehole (permitted but not completed) <br />• 5 -Main North Cement Borehole <br />• 13 -Left Outby Utility Borehole <br />• 9RT Utility Borehole <br />• SWMD Thickener Underflow Boreholes (1 SW & 2SW) <br />• Sandstone Sub Test Borehole <br />• Sandstone Sub Thickener Underflow Borehole and Pipeline <br />TR17-88 2.05-11.2 06/10/17 <br />