TC has included the costs for this additional slab in the associated bond calculations. Power is supplied to the BOB <br /> Conveyor from the substation east of the Tipple over to the MCC building. <br /> CYCC's loadout site was constructed within the disturbed area between the processing facilities and the railroad <br /> tracks. The site was excavated down to the elevation of the tracks. A ramp was built-up to accommodate loading <br /> of the cars. The site is approximately 150 x 300 x 6 feet. Approximately 10,000 CY was excavated from the site, <br /> with some of the excavated material placed east of the site near the railroad tunnel and road, allowing for improved <br /> drainage from this area. The drainage from this area will <br /> TR17-88 2.05-33 06/10/17 <br />