Laserfiche WebLink
Rule: 2 03 10 Other Liscenses and Permits <br />The above rule is adequately addressed. <br />Rule: 2.04.3 Site Descrir)tion and Land Use (Brock) <br />The above rule is adequately addressed. <br />Rule: 2.04.4 Cultural and Historic Information <br />The above rule is adequately addressed. <br />Additionally, The Office of Archeology and Historic Preservation's letter was supplied <br />by DRMS to TMI on 7 May 2017 for their records. <br />Rule: 2.04.5 <br />The above rule is not adequately addressed. <br />For compliance with Rule 2.04.5(2)(c) Please see adequacy question #16 below <br />regarding pre and post mining contours for stream channels. <br />For compliance with Rule 2.04.5(1)-(3) please see below for Geologic and <br />Hydrologic specific sections, Rules 2.04.7(1) and (3)-(4) - Hydrology Description. <br />Rule: 2.04.6 Geoloav Description <br />It does not appear that all permit stipulations have been complied with for mining <br />of the eastern expansion area. Stipulations 21 and 22 are still listed as Future <br />status. Not all aspects of these stipulation have been provided to DRMS. <br />As part of Stipulation 22, in relation to the geology in the eastern expansion area: <br />(c) A geology description that updates Sections 2.7.2 and 2.7.3 of the Trapper Mine <br />permit application package with the information required by Rule 2.04.6(2)(a) and <br />(b). <br />Within the PR8 review, TMI stated that: <br />"Trapper is not requesting to mine the PR -7 area with this revision. The operator <br />states that additional geologic information will be provided as a revision at the time <br />the mining plan is submitted. A study of overburden characteristics has been <br />conducted, and a new section added for the Overburden Geochemistry of the PR7 <br />Expansion Area. Corehole data is provided and a map included." <br />PR 9 does not include additions to geologic information as stated in the stipulation <br />above. <br />5. Please update Sections 2.7.2 and 2.7.3 of the Trapper Mine permit application <br />package with the information required by Rule 2.04.6(2)(a) and (b). <br />Trapper PR9 Preliminary Adequacy Prepared by: R. Reilley, GISP, M.S. Page 2 <br />Date: May 2018 <br />