Laserfiche WebLink
term, through 2022. The Life of Mine Plan, map M4 illustrates the mining sequence <br />through the permit term. <br />Rule: 2.05.4 (2(b)(f), (g) Reclamation Plan <br />The above rule is adequately addressed. <br />The cost estimate Rule 4(2)b is in progress at DRMS. <br />Rule: 2.05.4 (2d, e) Reclamation Plan <br />The above rule is adequately addressed. <br />DRMS notes that the cover letter submitted with the revised pages states that <br />Trapper is proposing to modify the shrub density standard to include a 700 <br />stems/acre alternative standard. <br />29. Please insert a discussion of this alternate standard on page 4-101 where the <br />success standards are outlined. <br />Rule: 2.05.5 (1) <br />The above rule is adequately addressed. <br />Rule: 2.05.6 (1, 4, 5) Mitigation of Impacts <br />The above rule is adequately addressed <br />Rule: 2.05.6 (3) (a), (b) Mitigation of Impacts <br />Please see adequacy item listed under Rule 2.04.7 <br />Rule: 2.06.5 Special Categories of Mining <br />The above rule is adequately addressed. <br />Rule: 2.06.9 Highwall/Augering <br />Section 3.1.4.2 of TMI's permit addresses highwall mining. The above rule is <br />adequately addressed. <br />Trapper PR9 Preliminary Adequacy Prepared by: R. Reilley, GISP, M.S. Page 8 <br />Date: May 2018 <br />