My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-18_REVISION - C1981019 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-05-18_REVISION - C1981019 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2018 9:49:07 AM
Creation date
5/21/2018 9:01:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/18/2018
Doc Name
Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
MR186
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r] <br />TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br />May 18, 2018 <br />Mr. Zach Trujillo <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining & Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Colowyo Coal Company L.P. <br />Permit No. C-1981-019 <br />Minor Revision No. 186 <br />Collom In -Pit Drilling Program <br />Dear Mr. Trujillo, <br />Tri-State Generation and Transmission Association Inc. (Tri-State), is the parent <br />company to Axial Basin Coal Company, which is the general partner to Colowyo Coal Company <br />L.P. (Colowyo). Therefore, Tri-State on behalf of Colowyo is submitting this adequacy response <br />for minor revision 186 (MR -186) for Permit No. C-1981-019. Tri-State received your adequacy <br />letter dated May 18, 2018, and has prepared the following response: <br />The Division has performed a reclamation cost estimate to reclaim the additional Collom <br />in pit drill borehole length. In MR -186, the total of in pit drill holes has decreased from <br />33 to 27 however, the total length associated with the boreholes has increased from the <br />previously approved MR -174. The calculated cost is based on the difference in total <br />length required to plug the holes. Since Colowyo previously bonded for 33 boreholes, <br />markers and plugs were not included in this cost estimate. The Division calculated the <br />cost for this revision and the total value of this estimate is $13,199.06 (see attached cost <br />estimate). Additionally, attached is the task associated with all boreholes associated with <br />the Collom in pit drillingprogram to be incorporated into Exhibit 13C. The Division's <br />cost estimate is consistent with previous cost estimates approved by both the Division and <br />Colowyo. The Division respec NIly requests a response from Colowyo with any questions <br />regarding the cost estimate or an acceptance of the Division's estimate. <br />Response: Tri-State and Colowyo have reviewed the reclamation cost estimate prepared <br />by the Division, which proposes an increase in the overall reclamation liability by <br />$13,199.06 and hereby concurs with the cost estimate provided. <br />AN EQUAL OPPORT UNITY /AFF/RMATTVEACTTON EMPLOYER CRAIG STATION ESCAIANTE STATION NUCLA STATION <br />►O. sox 1307 P.O. sox s77 P.O. BOX &$ <br />A Touchstone EneTQy Cooperative CRAIG, CO 81436.1307 PREWITT. NM s7m NUCM. CO 61424.0690 <br />970.024-4111 $06-976.2271 970-964-7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.