My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-18_REVISION - C1981019 (8)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-05-18_REVISION - C1981019 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2018 8:38:37 AM
Creation date
5/21/2018 8:18:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/18/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
MR186
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />a Division of Reclamation, <br />Mining and Safety <br />May 18, 2018 Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Tony Tennyson Denver, CO 80203 <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Re: Colowyo Coal Mine (Permit No. C-1981-019) <br />Mnor Revision No. 186 (MR -186) <br />Adequacy Review <br />Dear Mr. Tennyson: <br />After reviewing MR -186 from Colowyo Coal Company L.P. (Colowyo), the Division has the following <br />comments: <br />1. The Division has performed a reclamation cost estimate to reclaim the additional Collom in -pit drill <br />borehole length. In MR -186, the total of in -pit drill holes has decreased from 33 to 27 however, the <br />total length associated with the boreholes has increased from the previously approved MR -174. The <br />calculated cost is based on the difference in total length required to plug the holes. Since Colowyo <br />previously bonded for 33 boreholes, markers and plugs were not included in this cost estimate. The <br />Division calculated the cost for this revision and the total value of this estimate is $13,199.06 (see <br />attached cost estimate). Additionally attached is the task associatedwith all boreholes associated wih <br />the Collom in -pit drilling program to be incorporated into Exhibit 13C. The Division's cost estimate <br />is consistent with previous cost estimates approved by both the Division and Colowyo. The Division <br />respectfully requests a response from Colowyo with any questions regarding the cost estimate or an <br />acceptance of the Division's estimate. <br />If you have any questions, feel free to contact me at any time. <br />Sincerely, <br />Zach Trujillo <br />Environmental Protection Specialist <br />(303) 866-3567 ext. 8164 <br />Zach.Trujillo@state.co.us <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining. state. co. us <br />John W. Hickenlooper, Governor I Robert W. Randall, Executive Director I Virginia Brannon, Director <br />flF'C-0 <br />H <br />I <br />'F1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.