My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-18_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2018-05-18_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:12:39 PM
Creation date
5/21/2018 8:05:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Hydrology
Doc Date
5/18/2018
Doc Name
Water Monitoring - Groundwater
From
Arcadis
To
DRMS
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 GROUNDWATER MONITORING REPORT <br />arcadis.com 2 <br />Between 2005 and 2017, an average of approximately 10,000 tons of bypass dust was placed in the CKD <br />disposal area each year. <br />In 2001, with the construction of the dry kiln, a pug mill was installed to add water to the bypass dust prior <br />to transporting the bypass dust to the CKD disposal area in the quarry, in order to reduce dust emissions. <br />With the addition of the pug mill, Holcim discontinued the use of sludge from the Fremont Sanitation <br />District WWTP for dust control. <br />Bypass dust is currently disposed of in a previously mined section (cut) of the limestone quarry to the <br />south of former monitoring well MW-10. The locations of cuts previously used for CKD disposal are <br />indicated on Figure 2. The bottoms of these cuts coincide with the top of the underlying Codell <br />Sandstone, which is the primary water-bearing unit in the quarry area. To prevent contact of CKD and <br />bypass dust with this groundwater, approximately 10 feet of shale was backfilled and compacted in the <br />bottom of these cuts prior to placement of CKD and bypass dust. The site geology and hydrogeology are <br />described in the Groundwater Monitoring Plan (GMP; Blasland, Bouck & Lee, Inc. [BBL] 2002). <br />1.3 Site Regulatory History <br />In Colorado, the DRMS is responsible for regulating CKD and bypass dust disposal. Therefore, the <br />requirements for CKD and bypass dust management are incorporated into each facility’s Mined Land <br />Reclamation Permit. The plant is permitted to dispose of CKD and bypass dust (although CKD is no <br />longer generated by the plant) in the quarry under State of Colorado Mining Permit No. M-77-344 <br />(permit). Specific requirements for protection of groundwater are described in Rule 3.1.7(7)(i) through (viii) <br />of the Construction Material Rules and Regulations (Mined Land Reclamation Board [MLRB] 2001) and <br />the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Commission <br />(WQCC) Regulation No. 41, Basic Standards for Ground Water (CDPHE 2008). <br />It was recently communicated to Holcim by the WQCC that the regulatory requirements established for <br />the site as determined by the DRMS may no longer be relevant. Because Holcim only recently received <br />this communication and no official policy has been established, in the interest of submitting this report in a <br />timely manner, it was prepared to summarize the data as it relates to the previously established <br />regulations and NPLs. The WQCC has indicated that they would be willing to review the data obtained to <br />date as it compares to WQCC Regulation No. 41 and provide guidance to any additional data that may be <br />required. <br />1.3.1 Baseline Groundwater Monitoring Program <br />On August 16, 1999, Holcim submitted a request to the DRMS for a Mine Permit Technical Revision TR- <br />06 (TR-06) to its permit for the disposal of CKD in previously mined areas at the quarry (K-S & Company <br />1999). TR-06 describes the CKD disposal procedures and facilities, a closure plan for the disposal areas, <br />erosion control measures used at the site, CKD sampling and analysis, and hydrogeologic conditions at <br />the site. The DRMS, formerly the Division of Minerals and Geology (DMG), reviewed TR-06 and <br />responded with an initial adequacy review letter on January 18, 2000 (DMG 2000). On behalf of Holcim, <br />K-S & Company submitted responses to DMG’s adequacy review letter in May 2001 (Holnam 2001). The <br />DMG responded with a second adequacy review letter on October 22, 2002 (DMG 2002).
The URL can be used to link to this page
Your browser does not support the video tag.