Laserfiche WebLink
LOPILEUTILITY SCARUTILITY SCARUTILITY SCARUTILITY SCAROPENSTORAGEOPEN STORAGESUBSTATIONCEMETERYSCATTERED SMALL TREESSCATTERED SMALL TREESSCATTERED SMALL TREESSCATTERED SMALL TREESSCATTERED SMALL TREESSCATTERED SMALL TREESCP-594-35035.1W.E.STOCKPILE AREA5040.4W.E.LOLOLO5099.9W.E.5056.7W.E.5025.8W.E.5017.24980.5W.E.W.E.5-25-3CP-509CP-513U.S. HIGHWAY 50U.S. HIGHWAY 50COLORADO STATE HIGHWAY 120COLORADO STATE HIGHWAY 120ROCK AND RAIL R.R.L STREET L STREETARKANSAS RIVERARKANSAS RIVER28205172.8PC960CP-1075122.1PC10585052B51SEC. 17N1/4 COR.5264.4ICC185191.7PC 1352221161515161095258.7ICC2153745954CP-95452CP-952197521221752G1820824725CP-9553162542927CP-974CP-918CP-921F <br />F RAMPDust SuppressionWater TankPipeline length = 2,000 ft.Pipe diameter = 2"3,139,000;1,205,6003,139,000; 1,208,2003,136,400 <br />MEDIUM GRADELIMESTONE5150514051305120511050005090508050705060505050405030515051405130512051105000509050805070506050505040503050205020MW-6 <br />(SEE NOTE 5) <br />MW-10 <br />(SEE NOTE 5) <br />MW-13 <br />(5021.65) <br />MW-7 <br />(5029.52)MW-9 <br />(5113.94) <br />MW-8 <br />(SEE NOTE 5) <br />(5158.14) <br />P-2 <br />(5074.79) <br />P-3 <br />(5035.11) <br />MW-12 <br />(5158.14) <br />NP-1 <br />(5104.47) <br />DP-1 <br />(5061.90) <br />5150 <br />MW-11 <br />(5041.23) <br />GROUNDWATER CONTOUR MAP <br />2IMAGES:XREFS: X-BasePROJECTNAME: ----CITY: SAN RAFAEL, CA DIV/GROUP: ENVCAD DB: R. PETRIE, K. DAVIS, J. HARRISC:\Users\jlharris\OneDrive - ARCADIS\BIM 360 Docs\LafargeHolcim\2018 GW Monitoring and Reporting\2018\B0025510.2018\01-DWG\Annual 2018 GWMR - Fig 2 - GW Contour Map.DWG LAYOUT: 2 SAVED: 4/16/2018 6:45 PM ACADVER: 21.0S (LMS TECH) PAGESETUP: ---- PLOTSTYLETABLE:PLTFULL.CTB PLOTTED: 4/16/2018 6:47 PM BY: HARRIS, JESSFIGURE <br />HOLCIM (US) INC. <br />PORTLAND PLANT, FLORENCE, COLORADO <br />MARCH 2018 GROUNDWATER MONITORING REPORT