My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-18_REVISION - M1978102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978102
>
2018-05-18_REVISION - M1978102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:21 PM
Creation date
5/18/2018 11:45:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978102
IBM Index Class Name
Revision
Doc Date
5/18/2018
Doc Name
Request for Technical Revision
From
Shipps Farm, LLC
To
DRMS
Type & Sequence
TR1
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF CO<O <br /> .g COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> IS76 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET lf4y FO <br /> ` �8��lFile No.: M- d? l� Site Name: / s JIV QN 8 <br /> County &,ae�z TR# jDRMS Use on1�y <br /> Permittee: �61��vs �.��. e-_z_c M-1978-102 - TR01 - <br /> Operator(If Other than Permittee): C c «� ��z`( Complied! <br /> NO prior Violations! <br /> Permittee Representative: ecs, whe <br /> Please provide a brief description of the proposed revision: <br /> 3t; r 4�-Ic_ > <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 1 IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.