My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-18_HYDROLOGY - P2017008
DRMS
>
Day Forward
>
Hydrology
>
Prospect
>
P2017008
>
2018-05-18_HYDROLOGY - P2017008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2021 10:33:29 AM
Creation date
5/18/2018 11:02:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2017008
IBM Index Class Name
HYDROLOGY
Doc Date
5/18/2018
Doc Name Note
FINAL
Doc Name
Abandonment Report
From
Brandon Heser
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GWS-51 NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) JUL 2 8 20I7 <br /> 02/2017 Please type or print legibly in black or blue ink or file online,dwmermitsonlinegstate.co.us <br /> State of Colorado,Office of the State Engineer 1313 Sherman St,Room 821, W%JER RMOURC <br /> SS <br /> Denver,CO 80203 Phone 303-866-3581 www.water.state.co.us STATE ENGNNEEt <br /> COLD <br /> Well owner Name(s): Transit Mix Concrete Co. <br /> Location: Section 16 <br /> Address: 444 E. Costilla, Colorado Springs, CO 80903 Township 16 QN ES,Range 67 t3E OW, 6th PM <br /> Phone: (719)475-0700 County: El Paso <br /> Email: Brandon_Heser@transitmix.com Subdivision: <br /> Lot: Block: Filing: <br /> Landowner's Name: RMBC Group LLC Site/Property Address <br /> Please check one and complete as indicated including contact info: <br /> 1510 GPS Location in UTM format if known: <br /> 'I Water Well Driller Licensed in Colorado-Lic. No. Set GPS unit to true north,datum NAD83,and use meters for <br /> ❑Professional Engineer Registered in Colorado-Reg.No. the distance units,QZone 12 or OZone 13. <br /> 0 Professional Geologist per C.R.S.23-41.208(b) Easting 509974 Northing 4278625 <br /> ❑ Other — anyone directly employed by or under the supervision of a licensed is of Monitoring Holes to be constructed in Section: 6 <br /> driller,registered professional engineer or professional geologist Estimated Depth 100 Ft.,Aquifer Fountain SST <br /> Contact/Company Authentic Drilling <br /> Address 201 Perry Park Ave. #105 Purpose of Monitoring Hole(s) To determine <br /> City,State a Zip Larkspur, CO 80118 ground water depth and flow near the <br /> Phone (720)465-1450 Ute Pass fault and in the Fountain Formation. <br /> Email Marc@Authenticdritling.com Anticipated Date of Construction: 07/31/2017 <br /> Print Name:Marc Haes <br /> Date Notice Submitted: 07/27/2017 <br /> Signature or enter full name here: Brandon Heser (Must be at least 3 days prior to construction) <br /> ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br /> FOR OFFICE USE ONLY <br /> 5 Gg -7 7 - MH PROCESSED BY <br /> Div. Z WD BAs MD DATE ACKNOWLEDGED <br /> CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br /> A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br /> 1) Notice was provided to the State Engineer at least 72 hours prior to construction of monitoring&observation hole(s). <br /> 2) Construction of the hole(s)must be completed within 90 days of the date notice was given to the State Engineer. Testing and/or <br /> pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted during <br /> testing must not be used for beneficial purposes. The owner of the hole(s)is responsible for obtaining permit(s)and complying with all rules <br /> and regulations pertaining to the discharge of fluids produced during testing. <br /> 3) All work must comply with the Water Well Construction Rules, 2 CCR 402-2. Standard permit application and work report forms are <br /> found on the DWR website at htto://www.water.state.co.us. Well Construction and Yield Estimate Reports(GWS-31)must be <br /> completed for each hole drilled. The licensed contractor or authorized individual must submit the completed forms to this office within 60 <br /> days of monitoring hole completion. Aquifer testing information must be submitted on Well Yield Test Report(GWS-39). <br /> 4) Unless a well permit is obtained or variance approved,the holes)must be plugged and sealed within eighteen(IS)months after <br /> construction. An Abandonment Report(GWS-09)must be submitted within 60 days of plugging&sealing. The above MH <br /> acknowledgement number,owner's structure name,and owners name and address must be provided on all well permit application(s),well <br /> construction and abandonment reports. <br /> 5) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL,except for purposes of remediation(recovery)or as a <br /> permanent dewatering system,if constructed in accordance with the Water Well Construction Rules and policies of the State Engineer. <br /> 6) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS,PLEASE WRITE"NO HOLES CONSTRUCTED"ON A COPY OF <br /> THE ACKNOWLEDGED NOTICE WITH THE FILE NUMBER AND EMAIL TO THE DIVISION OF WATER RESOURCES AT <br /> DWRpermitsontine@state.co.us. <br /> THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S)CAN BE APPROVED. <br /> Incomplete forms or Notice provided less than 72 hours prior to welt construction will not be acknowledged <br />
The URL can be used to link to this page
Your browser does not support the video tag.