Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> <br /> COAL MINING PERMIT - TECHNICAL REVISION DECISION <br /> Colowyo Coal Mine , Colowyo Coal Company L.P. <br /> Permit No. C-1981-019 <br /> <br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided <br />there are no objections, the decision will become effective upon the termination of the ten (10) day <br />public comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br /> <br />Technical Revision No. 120 Decision: Approve <br />Submittal Date: April 20, 2018 Decision Date: May 18, 2018 <br />Description of Revision: Collom Pond As -Built <br /> <br /> <br />DIVISION OF RECLAMATION, MINING AND <br />SAFETY <br />PERMITTEE <br /> <br /> <br /> <br /> <br /> <br />Authorized Representative - Division Authorized Representative - Permittee (if applicable) <br /> <br />Date: May 18, 2018 <br /> <br />Date: <br /> <br />CHANGE IN ACREAGE REVISED TOTAL ACREAGE PERFORMANCE BOND <br />Disturbed: 0.00 Disturbed: 6,010.50 Prior Liability: $190,428,015.01 <br />Affected: 0.00 Affected: 6,020.00 Change in Liability: $0.00 <br />Permit: 0.00 Permit: 27,529.24 Revised Liability: $190,428,015.01 <br />State: 0.00 State: 1,277.00 Bond Held: $95,517,829.00 <br />Federal: 0.00 Federal: 3,573.07 <br />Private: 0.00 Private: 22,679.17 <br />County: 0.00 County: 0.00 <br /> <br />REVISED APPLICATION PAGES REVISED MAPS <br />Exhbit, Item 26, Pages i, 23C-1, 23C-2, 23D-1, 23D- <br />3, 23E-1, 23E-3, 23F-1, 23F-2; Figures 7-26C-1, <br />Figures 7-26D-1, Figures 7-26E-1, and Figures 7- <br /> N/A