05.17.2018 Memo Pg.03 <br /> <br /> <br />2016 Annual Reclamation Report: <br /> On the ARR reporting form, Phase II acres cannot be less than Phase III acres. Phase <br />II acres must be at minimum 27.2 acres. <br /> <br /> DRMS permit system shows total disturbed=129.3 ac. [155.6 total dist. – 27.2 ac. <br />Phase III= 128.4] There appears that there is an error of 0.9 acres. LCC need to <br />determine where this discrepancy is, and resolve the difference. <br /> <br /> DRMS record show the SL2, approved 2008, approved 27.2 acres for Phase I, Phase <br />II, and Phase III. NECC needs to revise the ARR form to reflect the correct bond <br />release values. <br /> <br /> DRMS permit system shows cumulative Phase I release of 149.3 acres. NECC is only <br />reporting 122.1 acres having been approved for Phase I bond release. Even though <br />27.2 acres were approved for phase I, II and III bond release, the Division still tracks <br />these acres in the permit system, even if they have bee subsequently removed from <br />the permit area boundary. <br />SL1 approved Phase I release for 122.1 acres. NECC has reported this value correctly. <br /> <br />