Laserfiche WebLink
0 <br />May 11, 2018 <br />Page 2 <br />2. The North Ditch of Pond NHN-002 was removed from Map 2.05.3(4)-11. Most of the <br />north ditch was reclaimed, topsoiled and seeded, but the section north of Topsoil Pile 4 <br />was not reclaimed. This section of the ditch needs to remain in the permit. Please add this <br />section of the North Ditch to Map 2.05.3(4)-11. <br />Response: Map 2.05.3(4)-11 has been revised to include Station 20+80 to 30+30 of the <br />Pond NHN-002 North Ditch. This is consistent with information provided in the most <br />recent NHN Annual Reclamation Report. Also, Maps 2.04.7-1, 2.05.2-1, 2.05.3-3, <br />2.05.3(4)-1, 2.05.3(4)-10, 2.05.4(2)(d)-2 and 4.05.18-1 have been revised to include this <br />information. <br />Also included with this adequacy response package are materials revised in response to your <br />adequacy comments and a change of index sheet to ease incorporation of this material into the <br />permit document. If you have any questions regarding the enclosed adequacy review responses, <br />please contact Tony Tennyson at (970) 824-1232 or ttennyson(a,tristategt.org. <br />Sincerely, <br />Daniel J. Casiraro <br />Senior Manager <br />Environmental Services <br />DJC:JSS:der <br />Enclosures <br />cc: Frank Ferris (via email) <br />Chris Gilbreath (via email) <br />Jason Storey (via email) <br />Tony Tennyson (via email) <br />File: G474 -11.3(21)c-4 <br />AN EQUAL OPPORTUNITY/AFFIRMATIVE ACn ON EUPLOVER <br />A Touchstone Energy' Cooperative <br />