Laserfiche WebLink
EXH[BIT"U <br /> SEE ATTACHED DETAILS <br /> Reclamation Costs <br /> Reclamation Cost Estimate: <br /> Item Task Qty Unit Unit Cost Extended Notes: <br /> Cost <br /> 1 MobiluAtion/Demobilmuon 2 EA $550.00 <br /> 2 Replace wexburden LCY $0.75 <br /> 3 Disc or scarify ACRE $85.00 <br /> 4 Replace topsoil LCY $0.75 <br /> 5 Seedbed prep _ ACRE $85.00 <br /> 6 Fertilizer application ACRE $28.00 <br /> 7 Drill seed areas ACRE $195.00 <br /> 8 Mulch,tack hay or straw ACRE $150.00 <br /> 9 Weed control ACRE $35.00 <br /> Total <br /> Total Direct Cost <br /> Indirect Cost <br /> Public Liability Insurance 1.55% <br /> Contractor Performance Bond Cost 1.55% <br /> Contractor Profit 10 0% <br /> Div. of Reclamation,Mining and Safety Admin Costs 5.0% <br /> Additional Supervision 5.0% <br /> Estimated Financial Warranty Required <br />