Laserfiche WebLink
�0 OF CotO� <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> », 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> 1876 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET RECEIVE() <br /> File No.: M- 1987-171 Site Name: Fountain Colony Pit MAY 15 2018 <br /> County po El Paso County TR# WSIOvo Ec6a�riaN <br /> y <br /> Permittee: Kiewit Infrastructure Co (Formerly Kiewit Western Company) <br /> Operator p (If Other than Permittee) Mark P Campbell M_1987_171 — TR03 - <br /> Permittee Representative: Larry McKinney Complied! <br /> NO prior Violations! <br /> Please provide a brief description of the proposed revision: tcl, whe <br /> The weed control plan is being submitted as a Technical Revision JR) <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 F <br /> 112 hard rock(not DMO) $175 El <br /> 110d, 112d(1, 2 or 3) $1006 0 <br />