Laserfiche WebLink
ARCADIS <br /> Boring/Well Construction Log <br /> Job Number: Client: Location: Well Number: Page3 Location: <br /> C0001701.0001 Climax Molybdenum Co. Climax Mine ARK-MW-001 D of 3 <br /> Drilling Method: Sampling Method: <br /> Air Rotary:ODEX,8.75 in.;Downhole Hammer7.5 in. Chips Seperated by Cyclone <br /> Drilling Start: 08/30/12 16:45 Develop Start: 09/8/12 09:50 <br /> Finish: 09/6/12 17:30 Finish: 09/8/12 10:40 A <br /> Depth to Water: Drilled By: <br /> -5.5 ft bgs Precision Sampling, Inc. 0 'Sn Ice nee <br /> Elevation TOC: N/A Logged By: <br /> GL: N/A Paul Williams & Matthew W. Bauer, PG UTM:13N 396993,4357590 N <br /> i Well E CO w <br /> Name Color Description,Remarks <br /> m Construction <br /> 0 <br /> (Ojr Sch 40 PVC <br /> Screen <br /> Granodiorite GLEY 1 <br /> 51N <br /> 0 <br /> Shale:laminated,hard,fine grained,muscovite,quartz,and feldspar,trace pyrite.Hole Dry.0- <br /> entrelizer <br /> rl <br /> O <br /> Shale GLEY 1 <br /> 2.5/N <br /> A <br /> O <br /> A <br /> Ul <br /> entrelizer <br /> O nd Cap <br /> Electronic log compiled by:Laura Madsen <br />