Laserfiche WebLink
Water Quality Monitonng Plan Climax Molybdenum Company <br /> Version: R4 Permit No. M-1977-493 <br /> 8.0 REFERENCES <br /> Arcadis, 2012. Hydrogeologic Conceptual Model and Proposed Groundwater Monitoring and Compliance <br /> Locations at Climax Mine. Letter Report, April 27, 2012. <br /> Climax Molybdenum Company, 1984. Seismic work along Tenmile Creek at the northeast end of Wheeler <br /> Flats. Interoffice Memo, 1984. <br /> Climax Molybdenum Company, 2018. Plan for Adoption of Numeric Protection Levels at Groundwater <br /> Point of Compliance Wells. January 18, 2018. <br /> Freeze, R. Allan, Cherry, John A., 1979. Groundwater. Prentice Hall, Inc., Upper Saddle River, NJ. <br /> 604pp. <br /> Gibbons R.D., 1994. Statistical Methods for Ground-Water Monitoring. John Wiley & Sons, New York. <br /> 1994 1st ed, 2009 2nd ed. <br /> Kumar & Associates, 1993. Geotechnical Engineering Study - Proposed Robinson Lake Seepage <br /> Collection System. Eagle Park Reservoir Project, Climax, CO. Prepared for Cyprus Climax Metals <br /> Company. 1993. <br /> Kumar & Associates, 1994. Geotechnical Engineering Study- Proposed Process Water Collection and <br /> Impoundment Reservoir Downstream of Robinson Tailing Pond and Dam No. 1. Eagle Park <br /> Reservoir Project, Climax, CO. Prepared for Cyprus Climax Metals Company. 1994. <br /> Tetra Tech, 2013. Status Report; Robinson Seep Investigation. Prepared by Tetra Tech for Climax <br /> Molybdenum. November 2013. <br /> Tetra Tech, 2014. 2014 Status Report; Robinson Seep Investigation. Prepared by Tetra Tech for Climax <br /> Molybdenum. November 2014. <br /> Tetra Tech, 2016a. Eagle Park Reservoir Chemical Loading and Mixing Analysis. Tech Memo submitted <br /> as an attachment to a Climax letter to DRMS, dated March 23, 2016. <br /> Tetra Tech, 2016b. Review of Ground Water Monitoring Plan and Available Groundwater Monitoring Data; <br /> Comparison to and Demonstration of Compliance with WQCC Regulation 41 - Interim Narrative <br /> Statewide Standard (CBSG Section 51.5(C)(6)(b)(i)). December 2016. <br /> Titan Environmental Corporation, 1994. Shaft 5 Pump Station Hydrogeologic Evaluation. Prepared for <br /> Cyprus Climax Metals Company. September, 1994. <br /> U.S. Environmental Protection Agency, 2006. Data Quality Assessment: Statistical Methods for <br /> Practitioners: EPA QA/G-9S, EPA/240/B-06/003. <br /> EPP—Appendix C May 2018 36 <br />