Laserfiche WebLink
Water Quality Monitoring Plan Climax Molybdenum Company <br /> Version: R4 Permit No. M-1977-493 <br /> Clinton Reservoir (Figure 5). The second monitoring site is at the inlet to the East Interceptor culvert (EI- <br /> SW1), below the McNulty Overburden Storage Facility and upgradient of Clinton Reservoir (Figure 5). <br /> These locations are used to detect potential water quality changes from surface runoff in the vicinity of mine <br /> facilities toward Clinton Reservoir. <br /> Monitoring parameters and schedule are in Section 4 and data evaluation procedures and follow-up actions <br /> to be taken by Climax specifically related to the monitoring sites above Eagle Park and Clinton Reservoirs <br /> are described in Section 6 of this WQMP. Water quality monitoring data which have been submitted in <br /> Annual Reports to DRMS are included in Appendix B-4. <br /> EPP—Appendix C May 2018 11 <br />