Laserfiche WebLink
�I <br />OXBOW MINING, LLC <br />3737 Hwy 133 P.O. Box 535 Somerset, Colorado 81434 USA Tel (970)929-5122 Fax (970)929-5177 <br />May 5, 2018 <br />Mr. Leigh Simmons <br />Environmental Protection Specialist RECE%VEp <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado, 80203 MA <br />pivision of R& Sa ety on, <br />Mining <br />Re: Oxbow Mininiz LLC Permit No. C-1981-022 - Request for MR -109 <br />CDOT-United Companies Hwy 133 Resurfacing project staging area <br />Dear Mr. Simmons, <br />Oxbow Mining, LLC submits this MR 109 to update permit application package (PAP) information <br />regarding: Allowing United Companies, a contractor to the Colorado Division of Transportation <br />(CDOT), a space within Oxbow Mining's permit area to be used as a temporary office and staging <br />area. <br />During 2018, CDOT will be having Highway 133 resurfaced in the Somerset, CO area. The <br />Construction Contractor, United Companies, will lease the area south of the Elk Creek Mine Bath <br />House for the purpose of staging trailers, construction equipment, workers, and materials in <br />conjunction with the construction project. <br />United Companies shall return the property to its present condition at the end of the lease. The <br />project is expected to be completed by September 30, 2018 <br />This Minor Revision 109 will replace page 2.05-23e of the PAP with the attached updated version. <br />Please contact me at (970) 929-6034 should you have questions or require further information. <br />Sincerely, <br />Doug A. Smith <br />Chief Engineer <br />Attachments <br />0 Page 12 <br />