My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-10_REVISION - X201723402
DRMS
>
Day Forward
>
Revision
>
Coal
>
X201723402
>
2018-05-10_REVISION - X201723402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 10:29:19 AM
Creation date
5/11/2018 10:23:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201723402
IBM Index Class Name
Revision
Doc Date
5/10/2018
Doc Name
Application
From
Trapper Mining Inc
To
DRMS
Type & Sequence
AM1
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• WILLIAMS FORK LAND COMPANY <br />ESTIMATE OF RECLAMATION COSTS FOR EXPLORATION DRILLING <br />WEST PANEL STATE EXPANSION AM -1 <br />TABLE 1:2018 ESTIMATE OF RECLAMATION COSTS FOR EXPLORATION DRILLING <br />Hole ID <br />Depth <br />of Drill Hole <br />(ft) <br />Core Plugged Total Drill Hole Cement Driller Labor <br />Depth Hole Depth Depth Volume Cost Cost <br />(ft)' (ft)2 (ft) (ft3)2 ($10/ft3)3 ($)4 <br />Drill Pad <br />Area <br />(acres)5 <br />Drill Pad <br />Disturbed Depth <br />(ft) <br />Disturbed Pad <br />Volume <br />(yd) <br />Pad <br />Regrading <br />(Backfill)6 <br />Pad <br />Topsoil <br />(Replacement)' <br />Access Road Access Road <br />Length Area <br />(ft) (acres)8 <br />Access Road <br />Disturbed Depth <br />(ft) <br />Disturbed Road Access Road <br />Volume Regrading <br />(yd) (Backfill)' <br />Access Road <br />Topsoil <br />(Replacement)10 <br />Revegetation Revegetation Revegetation Revegetation Total <br />Seeding Labor Failure Failure Labor Reclamation <br />(Costs)" (Cost)1Z (cost)" (Cost)'" (Costs) <br />18_691_29_1 <br />90 <br />90 <br />0 <br />90 <br />15.9 <br />159 <br />700 <br />0.23 <br />5.0 <br />1,852 <br />10 <br />350 <br />0 <br />0.00 <br />1.5 <br />0 <br />0 <br />0 <br />$7 <br />100 <br />3 <br />50 <br />$2,179 <br />18_691_29_2 <br />155 <br />155 <br />0 <br />155 <br />24.3 <br />$ 243 <br />$ 700 <br />0.23 <br />5.0 <br />1,852 <br />$810 <br />$350 <br />580 <br />0.20 <br />1.5 <br />483 <br />$282 <br />$423 <br />$13 <br />$100 <br />$6 <br />$50 <br />$2,977 <br />18_691_29_3 <br />145 <br />145 <br />0 <br />145 <br />23.0 <br />$ 230 <br />$ 700 <br />0.23 <br />5.0 <br />1,852 <br />$810 <br />$350 <br />770 <br />0.27 <br />1.5 <br />642 <br />$374 <br />$561 <br />$15 <br />$100 <br />$7 <br />$50 <br />$3,198 <br />18_ 691_ 29_Gravell <br />60 <br />0 <br />60 <br />60 <br />9.0 <br />$ 90 <br />$ 700 <br />0.23 <br />5.0 <br />1,852 <br />$810 <br />$350 <br />0 <br />0.00 <br />1.5 <br />0 <br />$0 <br />$0 <br />$7 <br />$100 <br />$3 <br />$50 <br />$2,111 <br />18_ 691_ 29_Gravel2 <br />60 <br />0 <br />60 <br />60 <br />9.0 <br />$ 90 <br />$ 700 <br />0.23 <br />5.0 <br />1,852 <br />$810 <br />$350 <br />0 <br />0.00 <br />1.5 <br />0 <br />$0 <br />$0 <br />$7 <br />$100 <br />$3 <br />$50 <br />$2,111 <br />18_691_29_Gravel3 <br />60 <br />0 <br />60 <br />60 <br />9.0 <br />$ 90 <br />$ 700 <br />0.23 <br />5.0 <br />1,852 <br />$810 <br />$350 <br />0 <br />0.00 <br />1.5 <br />0 <br />$0 <br />$0 <br />$7 <br />$100 <br />$3 <br />$50 <br />$2,111 <br />18 691_29_Grave14 <br />60 <br />0 <br />60 <br />60 <br />9.0 <br />$ 90 <br />$ 700 <br />0.23 <br />5.0 <br />1,852 <br />$810 <br />$350 <br />0 <br />0.00 <br />1.5 <br />0 <br />$0 <br />$0 <br />$7 <br />$100 <br />$3 <br />$50 <br />$2,111 <br />Total <br />630 <br />390 <br />240 <br />630 <br />99.2 <br />$ 992 <br />$ 4,900 <br />1.61 <br />5.0 <br />12,963 <br />$5,671 <br />$2,450 <br />1,350 <br />0.46 <br />1.5 <br />1,125 <br />$656 <br />$984 <br />$62 <br />$700 <br />$31 <br />$350 <br />$16,797 <br />Notes: <br />1 30 ft. added to core hole depth. <br />2 Assume 7.875 -inch diameter =0.338 ft.A3/ft.drill hole top 20 ft. core with 4 7/8 -inch diameter = 0.130 ft.A3/ft. Gravel holes drilled 5.25 -inch diameter =0.150 ft.A3/ft. <br />3 An 80 Ib bag of Sakrete will fill 0.6 ft3. Assume $6.00/ 80 Ib. bag, which equates to $10.00 per cubic foot of hole. <br />4 Cement and plug labor costs: Assume 2 hours per hole at $350 per hour (current rig, operator and helper rate). <br />5 Assume drill pad disturbance is 100 feet by 100 feet. <br />6 Assume D7 SU productivity of 400 Lcy's/hr at $175 per hour <br />' Utilize a D7 SU tracked dozer. Assume 2 hours per pad at $175 per hour with operator <br />8 Assume average access road width to be reclaimed 15 feet. <br />' Assume D7 SU productivity of 300 Lcy's/hr at $175 per hour with operator -- <br />10 Assume D7 SU productivity of 200 Lcy's/hr at $175 per hour with operator <br />11 Current cost for seed mix is $30 per acre. <br />17 Assume seed application will take 1 hours at $100 per hour for laborer and pickup. <br />13 Assume 50% failure rate reseed at $15 per acre. <br />14 Assume seed application will take 1/2 hours at $100 per hour for laborer and pickup. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.