My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-10_REVISION - X201723402
DRMS
>
Day Forward
>
Revision
>
Coal
>
X201723402
>
2018-05-10_REVISION - X201723402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 10:29:19 AM
Creation date
5/11/2018 10:23:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201723402
IBM Index Class Name
Revision
Doc Date
5/10/2018
Doc Name
Application
From
Trapper Mining Inc
To
DRMS
Type & Sequence
AM1
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indirect costs include contract costs of a job superintendent working 60 hours at <br />$58.56/hr. totaling $3,514. Profit, insurance, and bond are 13.07% of direct <br />costs totaling $2,195. The total contract amount is $22,506. Engineering costs <br />of $957 are 4.25% of the contract amount. The reclamation management cost <br />of $1,125 is 5% of the contract amount. <br />Activity <br />$16,797 <br />Units <br />Unit Cost <br />Total <br />Borehole Sealing <br />7 <br />Holes <br />$841.69 <br />/Hole <br />$5,892 <br />Drill Site Reclaim <br />7 <br />Sites <br />$1,160.19 <br />/Site <br />$8,121 <br />Access Road Reclaim <br />1,350 <br />Feet <br />$1.2153 <br />/Ft. <br />$1,641 <br />Reve etation & Failure Seeding <br />7 <br />Sites w/Roads <br />$163.32 <br />/Hole <br />$1,143 <br />Total Direct Costs <br />$16,797 <br />Direct Costs <br />$16,797 <br />Job Superintendent 60 hours x $58.56/hour <br />$3,514 <br />13.07% of Direct Costs includes profit, insurance, bond <br />$2,195 <br />Subtotal contract amount <br />$22,506 <br />Engineering 4.25% of contract <br />$957 <br />Reclamation Management 5% of contract <br />$1,125 <br />Total Bond Required <br />$24,588 <br />See Appendix C, Estimate of reclamation costs for additional exploration drilling <br />cost details by hole. <br />
The URL can be used to link to this page
Your browser does not support the video tag.