Laserfiche WebLink
NT U.S. DEPT. OF THE INTERIOR <br />A OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />I. Permittee/Person <br />BOWIE RESOURCES LLC <br />2. Address <br />6100 DUTCHNIANS LANE 9TH FLOOR <br />3. Ci 4. State <br />LOUISVILLE by <br />5. Zi Code 6. Phone Number <br />40205 (502)855-5157 <br />9. Permit Number 10. Permit Type <br />096083 PP <br />11. Field Visit Date <br />12. Purpose <br />13. SRA Present <br />4W2018 <br />OP <br />-Al r} <br />14. Permit Status <br />15. Site Status <br />16. Facility Type <br />ED <br />TC <br />BCFG <br />17. OSM Office 4 <br />18. CCID # <br />19. Land Code <br />[40 <br />F <br />SF <br />7. Operator Name, if Different than Permittee 20. M.S,H.A. ID 4 21. State Abbrev. 22. Coun Burrough <br />BOWIE RESOURCES LLC 05-04591 CO GUNNISON <br />8. Mine Name 23. AVS Permittee Entity ID Number 24. State Office <br />BOWIE NO.2 1154464 <br />25. Hours 26. Signature Block 27. Reviewing Official: <br />2.0 a. Permit Review ,fae,�- <br />4.5 b. Site Visit Time Signature Signature <br />8.0 c. Travel Time Christine Belka, ID#182 <br />d. Report Writing Inspector's Name Revic%r's Naint <br />2.0 <br />Date: 5/9/2018 Date: i <br />Permit Type -Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Oxx Oversight RFx Reclamation Fees CC Citizen Complaint (initial site visit) <br />Axx .Assistance Fxx Federal Actions CCF .Assistance <br />Joint Inspection - ttern 13 A joint inspection Is when a state inspector accompanies an OSM inspector at any time during Tie r-eviie-w-c-M e mine site <br />Permit Status - Item 14 AB Abandoned All surface and underground coal mining activities have ceased and operator <br />A Active Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined in 30 CFR B40 -11(g) <br />disturbed ABI Bond Forfeiture Bond forfeiture officially In processor completed and reclamation in <br />IN Inactive (Permanent Program Permit): Phase II completed or progress or not yet commenced. <br />Temporary Cessation of Operations (Interim Program Permit) AB2 Partially Reclaimed Forfeiture- Forfeited site where all bonds have been used to reclaim site <br />Coal mining completed and reclamation activities initiated but site not reclaimed to Program standards <br />BR Bond Release Reclamation completed and State Regulatory AB3 Reclaimed Forfeiture Forfeited site that has been reclaimed to Program standards <br />Authorky(RA) has released all of the bond (Phase III Release) NA Not Applicable When site is unpermitted <br />Site Status -Item IS MC Min -ng Complete No mining activity on alta site NS Non -Site Visit: Status of site not determined <br />NO No Disturbance No coal mining and reclamation regraded and awaiting bond release Forfeiture Pending The RA Is pursuing actions to <br />operations have been started TC Temporary Cessabon The RA has granted FP revoke the permit, colied the performance bond(s) <br />EX Coal Exploration Coal exploration operations have cessation of mining pursuant to 30 CFR and/or reclamation of forfeited site is In progress <br />started and where coal m ning operations have not 5161817 13(b) FR Forfeited and Reclaimed Forfeiture reclamation <br />begun P1 Phase I Release At lead Phase I bond re ease completed <br />AP Active Coal Producing Ccs: surface mining granted for entire permitted area For interim FO Abandoned Site: Abandoned site that Is permitted but <br />activities are occurring permits. partial bond release there is no bond <br />AN Active Non -Producing Active non. producing facility P2 Phase li Retease At least Phase I; bond release WC Wildest: Coal mining and reclamation operations have <br />such as tipple or preparation plant. for the entire permitted area or are taking place and the activity Is not covered by <br />NM No Mining The Permit Status is active, site is not in P3 Phase II; Release Reclamation completed and the required permits from the RA <br />Temporary Cessation no surface coal mining the RA has released all bond <br />activity. and site not regraded <br />Facillty Type Codes - Item 16 D Ancillary (Haulroad, Conveyor, and/or Rails H Exploration Permits K. Government Financed Construction Exemption <br />A. Surface E Refuse and/or Impoundment 1 Notice of Intent to Explore L Remirling site permitted under 30 CFR 705 25 <br />8 Underground F Load. ng Facility and/or Tipple J Exempt 16 and 213 <br />C Preparation Plant G Stockpiles <br />Small Business Regulatory Enforcement Falmess Act (SBREFAI <br />Your Comments are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments ham small businesses about Federal agency <br />enforcement actions The Ombudsman will annually evaluate the enforcement aclivites and rete each agency's responsiveness to small business, If you are a small business:a business with 500 or <br />tower employees including those of affiliates) and wish to comment on the enlorcement or compliance activities of OSM call t -8118 -REG -FAIR (1.886-734-3247) <br />Pape 1 <br />