Laserfiche WebLink
Tabetha Lynch, DRMS <br />Page 2 <br />4/30/2015 <br />PR 9 does not include additions to geologic information as stated in the stipulation above. Please <br />update Sections 2.7.2 and 2.7.3 of the Trapper Mine permit application package with the <br />information required by Rule 2.04.6(2)(a) and (b). <br />Note: I did not review the PR9 revision against all requirements of these stipulations. <br />Rule: 2.04.7(1) and (3)-(4) — Hydrology Description <br />Hydrology descriptions and Mitigation of Impacts of Mining for the N -pit redisturbance <br />area, is not adequately described as required by Rules 2.04.7(1)(b) and 2.05.6(3)(a) and <br />(b). <br />o Please provide additional text specific to the N -pit. This should meet the <br />requirements of the above stated rules and specifically address these rules in <br />relation to anticipated drawdown due to pit dewatering, anticipated rebound of <br />groundwater elevations, affects to surrounding wells and springs, ground water <br />quality, and storage and recharge capacity. This is a redisturbed area, however the <br />disturbance is going deeper than previously mined and will create a larger volume <br />of disturbance and increased permeability. <br />Rule: 2.05.4(2)(f)(along with 4.05.8, 4.11.4, and 4.14.3) and (2)(g) — Reclamation Plan <br />No adequacy items <br />Rule: 2.05.6(3)(a) -(b) — Mitigation of Impacts of Mining <br />See adequacy item listed under Rule 2.04.7 <br />