Laserfiche WebLink
<br />Pond D, pit pond, slurry impoundment, pond E, wash plant and Rom pile <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br /> <br /> <br />It appears the operator is on the third lift of the pile expansion and is drying materials to spread on the original waste pile. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br /> Roads appear to be maintained and in good condition. No issues have been noted from this inspection. <br /> <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY)