My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-07_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2018-05-07_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 3:34:27 PM
Creation date
5/7/2018 4:16:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
5/7/2018
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR103
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Memorandum - <br /> Liner Integrity Engineering Support ■ <br /> VLF2 Ore Stacking Recommendations <br /> NewFields Job No.475.0106.023 <br /> April 30,2018 <br /> TABLE 1 <br /> Parameter Value <br /> Maximum Ore depth Over Geomembrane Liner 800 feet <br /> Nominal Ore Angle of Repose Slope 1.4H:1V <br /> Overall Operational Ore Slope against Up-sloping Ground 1.6H:1V <br /> Overall Operational Ore Slope against Down-sloping Ground 2.5H:1V <br /> Overall Operational Ore Slope above PSSA Embankment 2.5H:1V <br /> Overall Operational Ore Slope above Mill 2.0H:1V <br /> Maximum Ore Lift Height with Rocks with a Diameters Less Than 3 inches 100 feet(Note 1) <br /> Maximum Ore Lift Height with Rocks with a Diameter Greater Than 3 inches 50 feet <br /> Minimum Ore Lift Height 20 feet <br /> Minimum Distance between the Crest of a Lift and Placement of Tailings 25 feet <br /> Nominal Ratio of Ore to Tailings Mixture 10% <br /> Note 1: This assumes that an engineered platform or base is available for initial loading(such as the PSSA) <br /> Our most important guideline regarding ore placement is that ore should always be placed in an <br /> uphill direction over the drain cover fill (DCF). Due to the relatively steep slopes at CC&V, any <br /> placement in downhill direction (directly over the DCF) increases the risk of a slide that may <br /> cause damage to the DCF, piping and or geomembrane. <br /> C:\Users\kcwilliams\AppData\Local\Microsoft\Windows\INetCache\Content Outlook\D7BPCP80\VLF2 Ore Stacking Recommendation(002).docx <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.