My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-07_REVISION - M2007013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007013
>
2018-05-07_REVISION - M2007013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:16 PM
Creation date
5/7/2018 12:00:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007013
IBM Index Class Name
REVISION
Doc Date
5/7/2018
Doc Name
Request for Technical Revision
From
McAtee Construction
To
DRMS
Type & Sequence
TR2
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 0 7 2010 <br /> of o <br /> p13 - T� <br /> DIVISION OF RECLAMATION -Zpp? <br /> �tAiFH�VTSION OF R 11�I .JD SAFETY <br /> C� <br /> COMPLIED!! <br /> 1313 Sherman Street,Room:l S,De TIONS <br /> Np VIOLA <br /> REQUEST FOR TECHNICAL R fle' whe <br /> , ..,uyER SHEET <br /> File No.: M- M-2007-013 Site Name: Bollish Pit <br /> County Logan TR# r r,,;I�► Use onLi), <br /> Iwo- <br /> Permittee:McAtee Construction Company, Inc. MAY <br /> y <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Rod Havens <br /> Please provide a brief description of the proposed revision: <br /> TR02 is to change the final reclaimed configuration to leave a 0.47 acre landowner <br /> borrow area on the north end of the mined area. Additional information and maps are <br /> attached as part of this request <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> sleets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After-the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 1 1 1, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 ❑ <br /> I I Od, 1 12d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.