Laserfiche WebLink
Operator Skill: <br />0.750 <br />Material consistency: <br />0.900 <br />Dozing method: <br />1.200 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />1.438 <br />Blade type: <br />1.000 <br />Net correction: 0.7734 <br />Adjusted unit <br />production: 3,549.52 LCY/hr <br />Adjusted fleet <br />production: 3549.52 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.127/LCY <br />Total job time: 0.17 Hours <br />Total job cost: $77 <br />(AVG.) <br />(CAT HB)) <br />(S -BY -S) <br />(AVG.) <br />(1 SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB <br />(PAT) <br />