Laserfiche WebLink
Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND_RF) <br />Push gradient: <br />1.426 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5548 <br />Adjusted unit <br />production: 2,546.25 LCY/hr <br />Adjusted fleet <br />production: 2546.25 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.177/LCY <br />Total job time: 3.13 Hours <br />Total job cost: $1,413 <br />